Architectural Feature: Concrete Slab
Date: 1943; 1999
To allow cost savings in the removal of 90' of sewer line, the Army demolished this 20' x 90' structure. No appropriate HABS documentation was done. Only the foundation and concrete floor remains (Photo No. 119).
Photo: 119.
Proposed work
Unless a creative reuse of the concrete floor can be found, remove remains and regrade during Phase III.
Updated January 27, 2004
Page created February 8, 2002